Signage Company in Boulder, CO: How Sign Permits Get Approved

Elevating Your Brand With The Best Signage Company In Boulder, CO

Most exterior signs in Boulder need a permit before they go up, and some locations also go through design or historic review. For many business owners, that paperwork is the most confusing part of getting a sign. A full-service signage company in Boulder, CO should handle it for you. This article gives a plain-language overview of how sign permitting works in Boulder, what documents are usually needed and how a signage company manages the process from first drawing to approval.

Note: rules change and every property is different. Always confirm current requirements with the City of Boulder or the jurisdiction that covers your address. This article is a general guide, not legal advice.

How Sign Permits Work With a Signage Company in Boulder, CO

Boulder regulates signs through its sign code, which sets rules for things like sign area, height, placement, lighting and the number of signs allowed. Before a new permanent exterior sign is installed, a permit application is typically submitted to the city and reviewed against those rules. Replacing a sign face, adding lighting or changing a sign’s size can also trigger review. Inspections may also be required after installation, particularly for lit signs and structures with footings.

The process is easier when someone who does it regularly prepares the package. That is a core part of what a signage company does: turning a design into drawings and calculations that a plan reviewer can approve.

Local Factors That Affect Your Approval

Zoning and location

What is allowed depends on your property’s zoning and frontage. A business on a commercial corridor like 28th Street may have different allowances than a mixed-use building downtown or an office in a business park.

Historic districts and design review

Downtown Boulder, including the area around the Pearl Street Mall, includes designated historic areas. Signs on landmark buildings or in historic districts can require additional review for materials, size, lighting and mounting, so they respect the building’s character.

City vs. county jurisdiction

Not every “Boulder” address is inside city limits. Some areas, including parts of Gunbarrel, are in unincorporated Boulder County, which has its own permitting process. Confirming jurisdiction is an early step.

Landlord and HOA approval

Many shopping centers and office parks have sign criteria. Landlord approval is often needed before the city application is submitted.

Documents a Sign Permit Application Usually Needs

Exact requirements vary, but a typical package includes:

  • Site plan: showing the property, building, street frontage and sign location, especially for freestanding signs.
  • Building elevation: a drawing or photo of the wall with the sign placed to scale.
  • Sign drawings: dimensions, letter heights, materials, colors and lighting.
  • Sign area calculation: how much sign area you are requesting compared to what is allowed.
  • Mounting and structural details: how the sign attaches to the wall or, for a monument, the footing design.
  • Electrical information: for lit signs, power requirements and listing information.
  • Property owner authorization: written consent from the owner or landlord.
  • Existing sign inventory: other signs already on the property that count toward the total.

What to Gather Before You Call

You do not need to prepare the permit package yourself, but a few items from you speed things up considerably:

  • Your lease or sign criteria, including any exhibit that describes allowed sign locations.
  • Landlord or property manager contact for approvals and access.
  • Logo files in vector format, plus brand colors.
  • Photos of the building, including the wall or area where you want the sign.
  • Information about existing signs, especially any left by a previous tenant.
  • Your target opening date, so the schedule can be planned backward from it.

Bridging the gap while you wait

Permit review can take longer than a new business would like. Depending on local rules, interim options can include window lettering, door vinyl or a temporary banner. Temporary signs often have their own limits on size and duration, so check before ordering. Interior signs, such as a lobby logo, can usually go in right away because they generally do not need a sign permit.

Sign Types and Their Permit Considerations

  • Wall signs and channel letters: reviewed for area, placement on the facade and lighting.
  • Monument signs: reviewed for height, setbacks, sight lines at driveways and footing design.
  • Projecting and blade signs: reviewed for clearance over sidewalks and projection distance.
  • Large building signage: may need structural review for wind load.
  • Electronic message centers: often face rules on brightness, motion and message changes.
  • Window graphics: sometimes count toward total sign area depending on coverage and placement.

Costs Connected to Permitting

  • City permit fees, which depend on the jurisdiction and project.
  • Drawing and preparation time for site plans, elevations and calculations.
  • Engineering, when structural details are required.
  • Resubmittals, if reviewers request changes.
  • Historic or design review, which can add steps and time.
  • Electrical permits, for illuminated signs where required.

Ask any signage company whether permitting is included in its quote and how resubmittals are handled.

How 303 Sign Company Handles Your Permit

  1. Site survey: we measure the wall, frontage and existing signs and confirm jurisdiction.
  2. Code review: we check the allowances for your property before designing, so the design starts inside the rules.
  3. Design and drawings: you approve scaled drawings that double as permit drawings.
  4. Landlord approval: we prepare the submittal for your landlord or HOA if required.
  5. Permit application: our in-house team submits the package and tracks it.
  6. Review comments: if the city asks for changes, we revise and resubmit.
  7. Fabrication and installation: once approved, we build and install the sign as permitted, and coordinate any required inspection.

Timelines depend on the reviewing agency and how complex the sign is. We give you an honest estimate early and update you as the review moves. See finished, permitted projects on our work page.

Permit Mistakes to Avoid

  • Ordering a sign before checking what size is allowed.
  • Installing without a permit, which can lead to fines or removal.
  • Forgetting to count existing signs toward your total allowance.
  • Assuming a replacement sign never needs review.
  • Skipping landlord approval and having to redesign after the city review.
  • Assuming city rules apply when the property is actually in the county.

Signage Company in Boulder, CO: Permit FAQ

Do I need a permit to replace a sign face?

Sometimes. A simple face change may be treated differently than a new sign, but changes in size, lighting or structure usually need review. Check with your signage company before ordering.

How long does sign permit review take?

It varies by jurisdiction, season and whether historic or design review is involved. Starting early is the best way to protect your opening date.

Can I apply for the permit myself?

You can, but the drawings and calculations need to be accurate. Errors in measurements or sign area are a common reason applications are sent back, so most businesses let their sign company handle it.

Do interior signs need permits?

Most interior signs do not, though permanent room signs must meet ADA rules. More answers are on our FAQ page.

Let Us Handle the Permit

If you want a signage company in Boulder, CO that takes care of permits in-house, we are ready to help. Call (888) 303-3936, Monday through Friday, 8:30 AM to 5:00 PM, or contact us to start with a site survey.

Accessibility Toolbar